

Proper installation boosts output by 15-20%, avoids die misalignment, and extends equipment life. Follow our field proven 4 stage process.
Anchor the machine to a solid foundation.
Assemble downstream units and prepare alignment.
Follow the numbered order: 1st(legs) → 2nd(short legs) → 3rd(platform) → 4th(traction). Correct order prevents structural twist.
Precision alignment of die head, extruder, and winder.
Connect power, cooling, and perform test run.
Extruder axis, die head center and traction line must be co-linear. Misalignment causes uneven film gauge and bubble instability.
Environmentally friendly materials
Integrated production lines
Maximising your return on investment
GET A QUOTE